Every job below is one we do ourselves across Santa Clarita.
We dig footings below the compacted soil line and set posts on concrete piers sized for the beam span, not just whatever the last guy used. Ledger boards get through-bolted and flashed, never just lag-screwed to siding, because that's the attachment point that rots first on a deck tied to the house. We frame on 16-inch centers for standard board but tighten to 12 for tile or stone finishes.
A lot of Santa Clarita lots step down a hillside, so the design work is really engineering work: figuring out post heights, lateral bracing and how the stairs land on grade. We draw it out before any lumber shows up, with beam sizes and footing locations marked so you know what you're approving.
Most repair calls start with a soft spot near the ledger or a post that's sunk because the footing was never poured deep enough. We pull the bad boards, check the joists underneath for dry rot, and only replace what's actually failed instead of tearing off a deck that's still structurally sound.
Santa Clarita sun is hard on exposed wood, cedar and redwood gray out and crack within a couple summers if nobody's keeping up the finish. We strip, brighten and let the wood dry fully before sealing, because trapping moisture under a new coat just blisters it off within a year. Composite doesn't require sealing but the boards still get a wash to pull the chalk and pollen off.
Composite boards expand and contract more than wood with temperature swings, so the gapping and fastener spacing has to match the manufacturer's chart or the deck buckles. We run hidden fastener clips on the field boards and picture-frame the perimeter with a different color board, which is the detail that makes a composite deck look finished instead of just functional.
If the frame underneath is still sound, there's no reason to tear the whole deck down to the footings. We pull the old decking, sister in any joists that have started to cup or twist, and lay new boards over a frame that's already proven it can carry the load.
Building code calls for a 4-inch sphere rule on baluster spacing, which trips up a lot of older decks built before that was enforced. We reset wobbly posts into the rim joist with through-bolts and structural screws, not just toe-nails, since a railing that moves under a hand is the first thing an inspector flags.
Tearing out an old deck means dealing with buried nails, old concrete footings, and sometimes rot nobody knew was there until the boards come up. We haul everything off the same day so you're not staring at a pile of treated lumber for a week.
A pergola or shade structure over part of the deck cuts down the afternoon glare without blocking the whole yard. We tie the posts into the deck framing or set separate footings, depending on what the existing structure can actually carry.
A lot of hillside lots around here need decks that step down in two or three levels just to use the yard at all. Taller posts mean more lateral load, so we add diagonal bracing and hold-downs at the post bases instead of relying on the railing to stiffen things up.
Four steps, and no surprises in any of them.
You tell us what you want doing, we look at what is actually there, and we ask the awkward questions early.
In writing, itemised, free. If something might add cost later we flag it now rather than at the end.
Same crew throughout. We cover your floors, keep the dust down and tidy up before we leave each day.
You point out anything you are not happy with and we fix it before the invoice, not after.
Deck crews working throughout these communities.
Questions that come up once a project is underway.
Describe the problem and we will tell you what it probably is. No obligation.