What We Do

Services

Everything we build, fix and maintain, from the footings up.

Home › Services

Everything we take on

Every job below is one we do ourselves across Santa Clarita.

Deck Installation

We dig footings below the compacted soil line and set posts on concrete piers sized for the beam span, not just whatever the last guy used. Ledger boards get through-bolted and flashed, never just lag-screwed to siding, because that's the attachment point that rots first on a deck tied to the house. We frame on 16-inch centers for standard board but tighten to 12 for tile or stone finishes.

Custom Deck Design

A lot of Santa Clarita lots step down a hillside, so the design work is really engineering work: figuring out post heights, lateral bracing and how the stairs land on grade. We draw it out before any lumber shows up, with beam sizes and footing locations marked so you know what you're approving.

Deck Repair

Most repair calls start with a soft spot near the ledger or a post that's sunk because the footing was never poured deep enough. We pull the bad boards, check the joists underneath for dry rot, and only replace what's actually failed instead of tearing off a deck that's still structurally sound.

Deck Staining & Sealing

Santa Clarita sun is hard on exposed wood, cedar and redwood gray out and crack within a couple summers if nobody's keeping up the finish. We strip, brighten and let the wood dry fully before sealing, because trapping moisture under a new coat just blisters it off within a year. Composite doesn't require sealing but the boards still get a wash to pull the chalk and pollen off.

Composite Deck Installation

Composite boards expand and contract more than wood with temperature swings, so the gapping and fastener spacing has to match the manufacturer's chart or the deck buckles. We run hidden fastener clips on the field boards and picture-frame the perimeter with a different color board, which is the detail that makes a composite deck look finished instead of just functional.

Deck Resurfacing

If the frame underneath is still sound, there's no reason to tear the whole deck down to the footings. We pull the old decking, sister in any joists that have started to cup or twist, and lay new boards over a frame that's already proven it can carry the load.

Deck Railing Repair & Installation

Building code calls for a 4-inch sphere rule on baluster spacing, which trips up a lot of older decks built before that was enforced. We reset wobbly posts into the rim joist with through-bolts and structural screws, not just toe-nails, since a railing that moves under a hand is the first thing an inspector flags.

Deck Demolition & Removal

Tearing out an old deck means dealing with buried nails, old concrete footings, and sometimes rot nobody knew was there until the boards come up. We haul everything off the same day so you're not staring at a pile of treated lumber for a week.

Deck Shade Structures & Pergolas

A pergola or shade structure over part of the deck cuts down the afternoon glare without blocking the whole yard. We tie the posts into the deck framing or set separate footings, depending on what the existing structure can actually carry.

Multi-Level & Hillside Decks

A lot of hillside lots around here need decks that step down in two or three levels just to use the yard at all. Taller posts mean more lateral load, so we add diagonal bracing and hold-downs at the post bases instead of relying on the railing to stiffen things up.

How It Works

Four steps, and no surprises in any of them.

01

We come and look

You tell us what you want doing, we look at what is actually there, and we ask the awkward questions early.

02

You get a price

In writing, itemised, free. If something might add cost later we flag it now rather than at the end.

03

We do the work

Same crew throughout. We cover your floors, keep the dust down and tidy up before we leave each day.

04

We walk it with you

You point out anything you are not happy with and we fix it before the invoice, not after.

Where We Work

All of this, across Santa Clarita, CA

Deck crews working throughout these communities.

Santa Clarita, CA
Los Angeles, CA
Lancaster, CA
Palmdale, CA
Glendale, CA
Simi Valley, CA
Thousand Oaks, CA
Burbank, CA
San Fernando, CA
Stevenson Ranch, CA
Acton, CA
Castaic, CA
Common Questions

Things worth asking

Questions that come up once a project is underway.

Do I need a permit to build a deck in Santa Clarita?
A permit is generally required for any deck higher than 30 inches off grade, and often for lower decks attached to the house as well. Permits involve a plan check and at least one framing inspection before the decking boards go down.
How long does it take to build a deck?
A standard ground-level deck usually takes one to two weeks from the first footing to the final board. Multi-level or hillside decks with engineered bracing can run three to four weeks depending on inspection scheduling.
Can a deck be built to a specific budget?
A deck can be designed around a set budget by adjusting the footprint, decking material and railing style rather than cutting corners on the framing. Pressure-treated lumber keeps costs down while composite and hardwood options raise the price per square foot.
Do you guarantee your deck work?
Workmanship on deck construction is backed by a warranty period, and materials like composite decking carry their own manufacturer warranty against fading or staining. Details on both are included in the written quote.
Who do I talk to once the deck project is underway?
A single point of contact is assigned for day-to-day questions once a deck project starts, so there's no runaround between a sales rep and the crew actually building it.
What decking materials do you work with?
Pressure-treated pine, cedar, redwood and composite brands like Trex and TimberTech are all used regularly, depending on budget and how much upkeep the homeowner wants to take on. Each material has a different expected lifespan and maintenance schedule.
Can I still use my yard while the deck is being built?
Most of the yard stays usable during deck construction, though the immediate work area gets fenced off for safety while footings are poured and framing goes up. Noise from saws and nail guns should be expected during daytime work hours.
How should I prepare the site before deck construction starts?
Clearing furniture, potted plants and anything stored under an existing deck makes the demo and framing stages go faster. Access to a gate or side yard wide enough for lumber delivery also helps keep the job on schedule.
What happens if you find rot or damage once the old deck comes up?
Hidden rot in the ledger board, rim joist or posts does turn up sometimes once old decking is removed, and it gets flagged before any new boards go on. Addressing it usually means a change order, but it's cheaper to fix while the frame is already exposed.
How do I take care of a new deck once it's finished?
Wood decking should be restained every two to three years in Southern California sun to keep it from graying and cracking. Composite decking just requires regular washing to clear off dirt and pollen, with no sealing required.

Not sure what you need?

Describe the problem and we will tell you what it probably is. No obligation.

Call (661) 990-9201